A lot has been completed on the inside of the home: drywall, walls and ceiling have the first layer of paint applied (primed), hardwood flooring installed, bath have been tiled, interior doors and trim, kitchen and bath cabinets installed, built-ins are almost done.
Next steps are: kitchen and bath cabinets counter tops, install wood treads on main stair, stair guardrails, complete minor trim details, paint, sand and finish hardwood flooring.